Client | Project | Equipment | Activity |
---|---|---|---|
TOTAL BELGIUM | TOTAL REFINARY OFF GAS (ROG) | Seamless Pumps | In Process Inspection on Performance/Mechanical Run Test, NPSH test, Hydrostatic test, Vibration test, API 685 Running clearance, Noise Test |
CONOCOPHILLIPS UNITED KINGDOM | JUDY NORTH SEA | CDD Pumps, Motor, Gearbox, Shaft and Mechanical Seal | Expediting of material build, FAT/Function Test, Witness Lift & Load Test, Doc Review and Inspection release Cert/COTE ‘C’ Sheet |
CHEVRON UNITED KINGDOM | CHEVRON ALDER | Corrosion Monitoring Spool | Hydrostatic Pressure Testing |
GE/BP UNITED KINGDOM | BP ARUNDEL Block 16/23 | Female and Male Coupler-Hydraulic Welded Assy | FAT, Dye Penetrant, Radiography |
GE UNITED KINGDOM | CHEVRON ALDER | Corrosion Monitoring Spool. | FAT, Functioning Tests, Electrical continuity tests, configuration settings, software & data recording, MRB review, Pack and documentation Release |
NORTH SEA UNITED KINGDOM | HORNSEA PROJECT Two (HP2) | Wind farm capacity of 1.8GW | Final Inspection |
TOTAL BELGIUM | TOTAL REFINARY OFF GAS (ROG) | Seamless Compressor Pumps | Impeller Balance test and Performance/ Mechanical Run Test |
NEXEN UNITED KINGDOM | Golden Eagle Area Development | Compressor | FAT/Function Test |
JOHNSON CONTROLS UNITED KINGDOM | JOHNSON CONTROLS | Air handling Unit | Witness Thermal Performance testing (30hr endurance test run) |
JOHNSON CONTROLS UNITED KINGDOM | JOHNSON CONTROLS | Air handling Unit | Witness Thermal Performance testing (30hr endurance test run) |
NORTH SEA UK | CULZEAN FIELD DEVELOPMENT | Electric Heater Package | Hydro/Pneumatic Testing and Final / FAT |
NORTHPETROFAC/ORLEN LIETUVA LITHUANIAN SEA UK | EPC FOR RHCU ISBL AND FEED Offsite Battery Limit (OSBL) PROJECT (Lithuanian refinery EPC project_ | API 685 Mag. Drive Sealless Pumps/ Sulphur mixed drain pump | Performance Test 4 hr Mechanical Run Test/NPSH Test/Noise Test, Hydrostatic Test of Casing/Containment Shell/Coupling Housing, Dynamic Balance of Impeller/OMR/IMR, ASME Running Clearance check, final and pre-shipment inspection, Test Document Review and Sign‐Off |
TECHNICAS REUNIDAS UNITED KINGDOM | TEESREP BIOMASS POWER STATION (Tees Renewable Energy Plant) 299MW biomass-powered, combined heat and power (CHP) plant) | CRYOGENIC PRESSURE VESSELS (Ambient vaporiser) | Expediting visit, Pressure Testing, Final inspection, MRB review |
WIGHTLINK FERRY UNITED KINGDOM | Wightlink Ferry (UK) | Laser Guidance Speed, Loading & Docking Monitoring System (Marine). | FAT/Instrument FAT and Performance Tests, including verification of all control functions, alarms and trips. & Documents review |
GE/SIEMENS UK | BGB Limited, UK/ Vestas Blades, Isle of Wight UK | Blades, Slip Ring, Hub Control, Power Supply System, Lightning Defence, Rotary Joints, Cable Looms & Harnesses, De Icer for Wind Turbine | Material Check, Fabrication, NDT, Electrical, Functional/Performance. |
CGN SUZHOU NUCLEAR POWER RESEARCH | HS890-2 Project | DYNAMOMETER | Fabrication, NDT, Coating, Welding, Assembly, FAT/Performance Test, Final Inspection and Document Review |
BAKER HUGHE | One Guyana FPSO -Yellowtail Project | Electric Motor Driver | Stator Core Flux Test, Document Review & Final Checks |
BAKER HUGHES/GE (BHGE) | SHWE Phase 2 Development Project | THERMO MECHANICAL CONTROLLED PROCESS (TMCP) LINE PIPES AND INDUCTION BENDS | Sample Selection, Preparation & Loading, Hose splice burst and leakage test, Dimensional Checks |
GENERAL ELECTRIC (GE) UNITED KINGDOM | APACHE ECHO 5 | Manifold Filter SCM | Expediting, PMI, Proof Pressure Tests, Dimensional Checks, FAT, MRB and release note |