ClientProjectEquipmentActivity
ADNOC Gas Processing (AGP)

ABU DHABI, UAE
UPGRADE OF ADIP TANKS IN RUWAIS TRAIN 1&2 PROJECTAPI 685 VERTICAL & HORIZONTAL PUMPSAssembly Mechanical Run/Performance Test including Full load & NPSH, Assembly noise test, Assembly vibration test
ADNOC ONSHORE/ROBT STONE

ABU DHABI
EPC FOR AL DABBIYA THAMAMA B TRANSITION ZONE DEVELOPMENTMotor Operated Choke Valves PackageExpeditor Visit for Manufacturing status Analysis 
HYUNDAI HEAVY INDUSTRIES Co. Ltd. (HHI) / Abu Dhabi Marine Operating Company (ADMA OPCO)

UAE
ABU DHABI
NASR PKG-2 Project (CCTC)Heating, Ventilation, Airconditioning & Cooling assembly (HVAC)Factory Acceptance Tests 
ARABIAN GULF /  ADMA-OPCO 

ABU DHABI, UAE
CCTC NASR PKG-2 Project HVAC Dampers:  Fire & Smoke proof Dampers (MDS), Shut off Dampers (MOD), Expediting of fabrication of over 3000 pcs HVAC Dampers:  Fire & Smoke proof Dampers (MDS), Shut off Dampers (MOD), Blast Dampers (BRD), Pressure Release Dampers (PRD) equipped with schischek explosion proof actuators for NASR Super Complex and Wellhead Platforms
ADNOC/ROBTSTONE

ABU DHABI
EPC FOR AL DABBIYA THAMAMA B TRANSITION ZONE DEVELOPMENT-PHASE II Actuated and Manual Choke ValvesExpediting Visits for Manufacturing status Analysis - Motor & Manual Operated Choke Valves Package.
ROBTSTONE ABU DHABIROBTSTONE ABU DHABIStock PipesChemical analysis 
ROBTSTONE ABU DHABITIE-INS OF BATCH-11 WELLSPipesDimensional inspection &

Quantity Verification , Visual Inspection, Verification & Correlation of product marking on material with MTC of 6" PIPE A333 G R 6 27.80 mm& 4" PIPE A333 G R 6 22.00 mm as per ASTM A333 & MESC SPE 74/004 and Material Delivery
DAAX CONSTRUCTION MMC, MEINHARDT/CSI

Baku Azerbaijan, UAE, IRAQ
Central Bank of Iraq, New Headquarters, Baghdad IRAQ ProjectNUAIRE FANS- AXC45AW-24S8H-1C/T, SQFTA46ES, AXT125DJ-41A7H-2J/T, AX63AD-24A7H+1Z/T, AXC125CZ-4KA7H+2NM/T, AX80MC*2RS8H+2MM/TFactory Acceptance Test for Fans – Measurement of Aerodynamic Performance, Measurement of Acoustic Performance- Differential (flow) pressure/Static pressures/

Barometric pressure/Temperature/

Humidity/Volts/Amps/Input power/

Speed verified.
ADNOC/ROBSTONE UAERumaitha NorthCO2 Project Expansion (WAG-CO2) PE Type 5 CL1500 Mechanical Visual Bi-directional Pig Signaller, c/w Manual reset flag, 2" CS Flange RF (A350 LF2) mounted, Inconel 625 internals & Signaller Removal ToolFabrication, Coating, FAT, Hydro testing, Operational Test, Document Review, Final Inspection and Dispatch 
ALLIANCE ENERGY GENERAL CONTRACTOR

 LLC 

ABU DHABI
Dabb'iya Thamama Zone B Transition Zone Developments - Phase 1 33KV OHL SWITCHESElectrical Testing /Functional Test 
ROBTSTONE 

ABU DHABI
TIE-INS OF BATCH-11 WELLS Solar SystemFAT/Instrument functional test
ARCHIRODON UAE
Dabb'iya PROJECTPAGA System CabinetsFactory Acceptance Testing, Functional Test, Visual Checks, Document review, Final Inspection & Release
Abu DhabiDabb'iya Thamama Zone B Transition Zone Developments - Phase 1Axial Fans & Powder Coated Air Handling Units (AHU) HeatingElectrical Testing /functions of circulating, cleaning, heating, cooling, humidifying, dehumidifying and mixing of air: up to 11.7m³/s. Cooling: up to 12.4m³/s. Range from 400 to 3,000 cfm
ROBTSTONE ABU DHABITIE-INS OF BATCH-11 WELLS High Security Extreme weather CCTV System.FAT/Instrument functional test 