ClientProjectEquipmentActivity
QATAR ENERGY/ VOLT AUTOMATIONEPIC for Telemetry System Replacement / Upgrade for MM & BH fields Wellhead Jackets and Real Time Data Transmission to Onshore ProjectFlowmeter5 Point Production Calibration & Functional Test
QATAR GAS

Topsides and Pipelines :Engineering, Procurement, construction, Installation and Commissioning (EPCI)PIG LAUNCHER DRAIN PUMPPMI, Hydrostatic Test, API 685 Running Clearance Check,

Performance Test (with Job Motor), Mechanical Run Test (4 Hour with Job Motor), NPSH Test (with Job Motor), Noise Test (with Job Motor), Vibration Test (including FFT with Job Motor)
BLACK CAT ENGINEERING
Arab D3 Gas Recycling Plant Exchangers, Surfer Converter reactors, Burners, Muffle Furnace, Incinerators, Vessels, Heaters, Boiler, Piping and StructuresCarry out Expediting/Inspection of various equipment during shut down phase 
SAIPEM/QATARGASEPCOL for North Field Production Sustainability (NFPS) Offshore & Pipelines Project MR TUBE AND TUBE FITTINGSVisual, Dimensional, Marking, Quantity checks, Material certificates review
SAIPEMEngineering, procurement, Construction, and Installation of NFPS ProjectMR TUBE AND TUBE FITTINGSVisual Inspection, Marking Inspection, Quantity Check, Material Certificate Review, Final Inspection, Export Packing and Release Note
BP

AZERBAIJAN
CHIRAG PH2 HYD Hunting CouplingFAT Male ROV with Tube Tail 
MCDERMOTT / QATARGASNORTH FIELD PRODUCTION SUSTAINABILITYInconel 625, CD PIPE SMLS B36.10/B36.19 BE B444 UNS N06625SAMPLE SELECT, FINAL HEAT TREATMENT, HARDNESS TEST SAMPLE, CORROSION TEST SAMPLE, TENSILE TEST SAMPLES, GRAIN SIZE, HYDROSTATIC PRESSURE TESTING, VISUAL INSPECTION, DIMENSION INSPECTION, ULTRASONIC TESTING, DYE PENETRANT TESTING OF END BEVEL, PMI, PART MARKING &COLOUR CODING, CERTIFICATION, PACKING & IRN 
MCDERMOTT/QATARGASNORTH FIELD EXPANSION (NFXP) PROJECT – OFFSHORE - Topsides and Pipelines : Engineering, Procurement, Construction, Installation and Commissioning (EPCI) PIG LAUNCHER SEAMLESS DRAIN PUMPDye Pen, PMI, Rotor balance, Hydrostatic Test, API 685 Running Clearance Check, Performance Test (with Job Motor), Mechanical Run Test (4 Hour), NPSH Test, Noise Test, Vibration Test (including FFT with Job Motor), Document Review and release 
MCDERMOTT/ QATARGAS,NORTH FIELD PRODUCTION SUSTAINABILITYValve Casting MaterialsSample selection & Loading, Witness of Mechanicals & Chemical Analysis, Corrosion Testing 
QATARGAS / ADANACQatar Liquefied Gas Co. Ltd (LQ Expansion Project)ValvesInspection of Assembled Valve, marking, Performing visual and final dimensional Inspection as per approved ITP, Witness Hydro testing, Seat Leakage Test, Cryogenic test, Witness Functional test, Review of MRB, Material Test Certificates and Testing Records, Issuing Inspection Release Note
GENERAL ELECTRICS (GE)  / TECHNIP) KUWAITLower Fars Heavy Oil Development Program Phase 1 FAT and Performance Tests & Review of Complete MDR/Release of SUPER-H PLUG VALVES
CARPENTER & PATERSONS LTDEpic for New Gasoline and Jet Storage Facilities In MIC ProjectVariable spring supportsReview of manufacturing Documents as per ITP activities
PUBLIC WORKS AUTHORITY ASHGHAL/ DUTCO TENNANT QATAR WLL /LARSEN AND TOUBRO LTD

DOHA QATAR
DBOM FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I PROJECTHelden Flange Adaptors & Flanged Spigot SetsQuantity Check, Dimensional Check, Visual Check, Coating Check, Packing, Documents Review
FGP/WPMP

KAZAKHSTAN
DOHA QATAR
CHEVRON CorporationPressure VesselsExpediting, Material checks,  dimension checks, mark-out and cutup preparation, weld & fabrication, pressure & leak tests 
QATARGAS/SAIPEMEPCOL for North Field Production Sustainability (NFPS) OFFshore & Pipelines ProjectMotorized Damper (EID), Fire Damper (MFD), Volume Control Damper (VCD), Blast Proof Damper (BRD), Weather LouversDimensional check, Overall build quality check, Inspection tagging, fire trigger check, Damper opening and closing operation,  Operation of switches, Electric continuity 5 open/closed cycle tests
MCDERMOTT/ QATARGAS,NORTH FIELD PRODUCTION SUSTAINABILITYFire Valve BodiesFurnace Loading & Unloading, Witness of Heat Treatment (HT) 
PETROCON ECC WLL

EPIC For Various Pipeline MOCS In Dukhan Project28” Bandlock 2 (Pig Launcher QOC)PMI, FINISH ASSEMBLY / FUNCTIONAL, FINAL INSPECTION, Nameplate Stamping, Document Review
MCDERMOTT/ QATARGAS,
NORTH FIELD PRODUCTION SUSTAINABILITY Valves and HubsUT, MPI, PMI, Radiography, Coating, Witness Functional/Performance, Gas, HP & Hydro tests, Final and Release 
NORTH OIL COMPANY (NOC)/PONTICELLI UPSTREAM LLCBlock 5 - AL SHAHEEN FIELD (DBN PWM & AB OBS EPCIC) Project150LB Y Type StrainerFabrication & Hydrostatic Testing for castings, forgings and fabricated strainers, Final Inspection & Packing Inspection
NORTH OIL COMPANY (NOC)PTSC MECHANICAL AND CONSTRUCTION Block 5 Al Shaheen Field Development GALLAF 3Maintenance Davit Arm / 2 x 30MT Pedestal Crane (API 2C)Pre-Inspection Meeting, Material Inspection, All Fabrication including kingpost, NDT, Coating, Welding, Fitting, Assembly, Electrical Testing, Load Test, FAT/Performance Test, Function Testing, Endurance Test, Creep Test, Noise Test, Safe Load Indicator Calibration, Hoisting & Slewing Speed Checks, Personnel Lifting Mode Test, Dynamic Overload Test, Gross Overload Release Test with SWL, Emergency Load Lowering & Slewing Test, Endurance Test, Final Inspection and Document Review.