ClientProjectEquipmentActivity
Larsen & Toubro Limited, (L&T Energy-Hydrocarbon)/ ONGC

INDIA
SPS & SURF for NEPL Block KG-DWN-98/2 Development ProjectTHERMAL WET  INSULATION MATERIAL FOR C25 & C55 Insulation MaterialsLab Test Analysis, Pre-shipping inspection, Visual inspection, MTC Review & packing of Wet Thermal Insulation 
MARULTHI ENGINEERING CORPORATION INDIALPG Suction and Discharge Project Technical ResourcesExpediting, Plan, arrange manpower and equipment to meet the project Quality and schedule. Engineering inputs for site resolution, site engineers, safety and quality personnel resources 
GE

INDIA
0NGC VASHISHTA Mono Coupler and ROV Stab couplingExpediting, Pressure and Flushing Tests, FAT, MRB review and Release note 
TATA/TECHNIMONT SpA/TOYO ENGINEERING IPL

INDIA
Paradip: EPCC-2: PAPAXYLENE PLANT PROJECTCompressor Package Assembly/800 KMTA Paraxylene UnitVarious final inspection activities (as per project ITP) on package assembly, Inspection of assembly and spares, Documentation reviews, Packing and Preservation for Shipment Including Packing List  

 Verification, Complete Contractor Release Note
ENGINEERS INDIA LTD/HATCH COMPANY INDIABPCL COCHIN – PDPP PROJECT Process Stream AnalyserCoating, FAT, 24 hrs Functional Test, Calibration, Accuracy & 8hrs Repeatability Tests, Visual & Dimensional Checks, (Checks include system function & Diagnostic display, Regents & Standard Set up, Ozone Purge, Pressure & Flow Tests, Relay outputs ETC) Full document review, Final Inspection & Release
 Verification, Complete Contractor Release Note
Scroll to Top