Client | Project | Equipment | Activity |
---|---|---|---|
ROSETTI MARINO ITALY | FENIX Project | FIRE DAMPERS and SHUT OFF DAMPERS | DIMENSIONAL AND FUNCTIONAL |
SNAM RETE GAS S.P.A ITALY | ODL-7800080136-SERCK AUDCO-UK Project | Valve - SUP-H CL600 + 3.1M Ext + GOV AC PVSA14698PL2 300HVA666FCOU+3.1M EXT T675 | PRESSURE TESTING, DYE-PEN SEALANT PIPE WELD, RADIOGRAPHY, DIMENSIONAL CHECK, DOCUMENTS REVIEW |
GEA BTT FRANCE | GEA BTT (France) | Air Cooled Heat Exchanger, | Expediting visit, Fabrication, Tube welding and document review , punch lists, and witnessing static/ dynamic commissioning system leak test. |
SAIPEM ITALY | ISND WHP-U08C PHASE 5-1B Project (SAIPEM) | THERMO MECHANICAL CONTROLLED PROCESS (TMCP) LINEPIPES AND INDUCTION BENDS, | Laboratory Testing of Metals for Resistance to Sulphide Stress Cracking and Strain Gauge Test in H2S Environments, Solution Preparation, Sample Loading, Magnetic Particles Inspection, Macro & Micro Examination of the specimen, Fugacity & Standard Conditions Test, Surface Roughness Control, Stereomicroscope Micrographs of Samples Surface, Optical Microscope Micrographs of Samples Cross Section, Metallographic Examination - TMCP CS Line Pipes, Transition Piece Mother Pipes, TMCP Bends, FBE + CWC Coating, |
GE FRANCE | GE Energy Power Conversion SAS | Nuclear reactor connectors | Expediting, FAT/Final Inspection & Review of Complete MDR/Release |