ClientProjectEquipmentActivity
ROSETTI MARINO  ITALYFENIX Project FIRE DAMPERS  and SHUT OFF DAMPERSDIMENSIONAL AND FUNCTIONAL 
SNAM RETE GAS S.P.A

ITALY
ODL-7800080136-SERCK AUDCO-UK ProjectValve - SUP-H CL600 + 3.1M Ext + GOV AC

PVSA14698PL2 300HVA666FCOU+3.1M EXT T675
PRESSURE TESTING, DYE-PEN SEALANT PIPE WELD, RADIOGRAPHY, DIMENSIONAL CHECK, DOCUMENTS REVIEW
GEA BTT 

FRANCE
GEA BTT (France)Air Cooled Heat Exchanger,Expediting visit, Fabrication, Tube welding and document review , punch lists, and witnessing static/ dynamic commissioning system leak test.
SAIPEM ITALYISND WHP-U08C PHASE 5-1B Project (SAIPEM)THERMO MECHANICAL CONTROLLED PROCESS (TMCP) LINEPIPES AND INDUCTION BENDS,Laboratory Testing of Metals for Resistance to Sulphide Stress Cracking and Strain Gauge Test in H2S Environments, Solution Preparation, Sample Loading,  Magnetic Particles Inspection, Macro & Micro Examination of the specimen, Fugacity & Standard Conditions Test, Surface Roughness Control, Stereomicroscope Micrographs of Samples Surface, Optical Microscope Micrographs of Samples Cross Section, Metallographic Examination - TMCP CS Line Pipes, Transition Piece Mother Pipes, TMCP Bends, FBE + CWC Coating, 
GE

FRANCE
GE Energy Power Conversion SAS Nuclear reactor connectorsExpediting, FAT/Final Inspection & Review of Complete MDR/Release 