ClientProjectEquipmentActivity
EGYPTIAN CHEMICAL INDUSTRIES (KIMA)

EGYPT
Ammonia & Urea Fertilizer Plant Project Diesel Tank & Equipment: Screw Air Compressors (Packages) (Diesel Engines & Electrical Drives),Package FAT and Performance Tests, 4 hr Test Run including verification of all control functions, alarms and trips.

Including Noise Level Test, E&I checks, Safety Valve testing, P&ID checks, Visual & Dimensional checks, Nameplate & Tagging checks, TP Interface & Connection checks, Anchor bolt & Shims check, Painting Inspection check - Visual inspection of Diesel Tank & Equipment: Screw Air Compressors (Packages) (Diesel Engines & Electrical Drives), Review of Plant MRB Docs/ reports, Punch List, Non Conformance and Deviation closeout/Release/Sign off
GE 

EGYPT
ENI ZOHR IUTA-SDU-Z8, multi -Way,150m long HFLExpediting visit, FAT, MRB review for HFL SDU 
ENI / PETROBEL EGYPTZHOR DEVELOPMENT PROJECT 2 High Voltage (HV) & Low Voltage (LV) Electrical Power UnitFAT/Instrument functional test including full load test 
ORASOM CONSTRUCTION

EGYPT
EGYPT INTERNATIONAL OLYMPIC CITY EGYPTIAN ARMY STADIUM ConstructionExpediting visit, Witness of Wind Tunnel Test covering Structure and Cladding analysis, Boundary layer wind tunnel, the mean speed profile and turbulence of the natural wind approaching, simulate four basic terrain conditions: Open Terrain, Water to Build up urban terrain, the wind load, The mean pressure, the root mean square of pressure fluctuations, Internal pressure and the peak positive pressures, typically conducted for 36 wind directions.
 Verification, Complete Contractor Release Note