Client | Project | Equipment | Activity |
---|---|---|---|
GE/ ENI ANGOLA | ENI MPUNGI BLOCK 15/06 | Flying leads/Harnesses | FAT on multiple Leg Combined Instrument Harness Assembly, Including continuity tests and Manufacturing Record Books, Mechanical Completion Dossiers and Dispatch Dossiers |
GE CONGO/ANGOLA | CHEVRON LIANZI PROJECT | Coupling with welded formed stainless tube and adaptor | Factory acceptance test (FAT) |
TOTAL E & P ANGOLA | TECHNIP KAOMBA BLOCK 32 | Bolting for FLET 7 & ILT/SS/ | Positive Material Identification (PMI) |
TOTAL E & P ANGOLA | TECHNIP KAOMBA BLOCK 32 | Bolting for FLET 7 & ILT/SS/ | Positive Material Identification (PMI) |
GE ANGOLA | ENI Angola Block 15/06 | SUBSEA PERMANENT MAGNET MOTOR/PUMP | FAT/Final Inspection & Review of Complete MDR/Release |
GE ANGOLA | SAXI BATUQUE | HFL & Umbilical assembly | Witness Blasting, Corrosion Control COATING (Primer, Mid Coat & Top Coat), Salt Test, Thickness Test, Holiday Test, Adhesion Test |
EXXONMOBIL Corp / GE ANGOLA | KIZOMBA SATELLITES PHASE 2 PROJECT (Angola Block 15); | HFL assembly | Expediting visit, PMI on pressure RS-8 & RS-16 coupler Grade 316, 316L, Super duplex stainless Body, tube and adaptor |
GENERAL ELECTRICS (GE) ANGOLA | SAXI BATUQUE | Specialist Valve | Witness Blasting & Corrosion Control coating |
ENI ANGOLA | ENI MPUNGI NORTH | Flying MQC Stab Plates (SDU & Manifold) | FAT, MRB review/SICD |
TECHNIP ANGOLA | TOTAL E&P Kaombo ANGOLA BLOCK 32 | Bolting for FLET 7& ILT / SS | Expediting visit, Final inspect., Shipping doc. Review, Hydro tests, Leak tests, Routine test, FAT, EFAT, SIT, MRB/Release |