Client | Project | Equipment | Activity |
---|---|---|---|
Larsen & Toubro Limited, (L&T Energy-Hydrocarbon)/ ONGC INDIA | SPS & SURF for NEPL Block KG-DWN-98/2 Development Project | THERMAL WET INSULATION MATERIAL FOR C25 & C55 Insulation Materials | Lab Test Analysis, Pre-shipping inspection, Visual inspection, MTC Review & packing of Wet Thermal Insulation |
MARULTHI ENGINEERING CORPORATION INDIA | LPG Suction and Discharge Project | Technical Resources | Expediting, Plan, arrange manpower and equipment to meet the project Quality and schedule. Engineering inputs for site resolution, site engineers, safety and quality personnel resources |
GE INDIA | 0NGC VASHISHTA | Mono Coupler and ROV Stab coupling | Expediting, Pressure and Flushing Tests, FAT, MRB review and Release note |
TATA/TECHNIMONT SpA/TOYO ENGINEERING IPL INDIA | Paradip: EPCC-2: PAPAXYLENE PLANT PROJECT | Compressor Package Assembly/800 KMTA Paraxylene Unit | Various final inspection activities (as per project ITP) on package assembly, Inspection of assembly and spares, Documentation reviews, Packing and Preservation for Shipment Including Packing List Verification, Complete Contractor Release Note |
ENGINEERS INDIA LTD/HATCH COMPANY INDIA | BPCL COCHIN – PDPP PROJECT | Process Stream Analyser | Coating, FAT, 24 hrs Functional Test, Calibration, Accuracy & 8hrs Repeatability Tests, Visual & Dimensional Checks, (Checks include system function & Diagnostic display, Regents & Standard Set up, Ozone Purge, Pressure & Flow Tests, Relay outputs ETC) Full document review, Final Inspection & Release Verification, Complete Contractor Release Note |