Client | Project | Equipment | Activity |
---|---|---|---|
ADNOC Gas Processing (AGP) ABU DHABI, UAE | UPGRADE OF ADIP TANKS IN RUWAIS TRAIN 1&2 PROJECT | API 685 VERTICAL & HORIZONTAL PUMPS | Assembly Mechanical Run/Performance Test including Full load & NPSH, Assembly noise test, Assembly vibration test |
ADNOC ONSHORE/ROBT STONE ABU DHABI | EPC FOR AL DABBIYA THAMAMA B TRANSITION ZONE DEVELOPMENT | Motor Operated Choke Valves Package | Expeditor Visit for Manufacturing status Analysis |
HYUNDAI HEAVY INDUSTRIES Co. Ltd. (HHI) / Abu Dhabi Marine Operating Company (ADMA OPCO) UAE ABU DHABI | NASR PKG-2 Project (CCTC) | Heating, Ventilation, Airconditioning & Cooling assembly (HVAC) | Factory Acceptance Tests |
ARABIAN GULF / ADMA-OPCO ABU DHABI, UAE | CCTC NASR PKG-2 Project | HVAC Dampers: Fire & Smoke proof Dampers (MDS), Shut off Dampers (MOD), | Expediting of fabrication of over 3000 pcs HVAC Dampers: Fire & Smoke proof Dampers (MDS), Shut off Dampers (MOD), Blast Dampers (BRD), Pressure Release Dampers (PRD) equipped with schischek explosion proof actuators for NASR Super Complex and Wellhead Platforms |
ADNOC/ROBTSTONE ABU DHABI | EPC FOR AL DABBIYA THAMAMA B TRANSITION ZONE DEVELOPMENT-PHASE II | Actuated and Manual Choke Valves | Expediting Visits for Manufacturing status Analysis - Motor & Manual Operated Choke Valves Package. |
ROBTSTONE ABU DHABI | ROBTSTONE ABU DHABI | Stock Pipes | Chemical analysis |
ROBTSTONE ABU DHABI | TIE-INS OF BATCH-11 WELLS | Pipes | Dimensional inspection & Quantity Verification , Visual Inspection, Verification & Correlation of product marking on material with MTC of 6" PIPE A333 G R 6 27.80 mm& 4" PIPE A333 G R 6 22.00 mm as per ASTM A333 & MESC SPE 74/004 and Material Delivery |
DAAX CONSTRUCTION MMC, MEINHARDT/CSI Baku Azerbaijan, UAE, IRAQ | Central Bank of Iraq, New Headquarters, Baghdad IRAQ Project | NUAIRE FANS- AXC45AW-24S8H-1C/T, SQFTA46ES, AXT125DJ-41A7H-2J/T, AX63AD-24A7H+1Z/T, AXC125CZ-4KA7H+2NM/T, AX80MC*2RS8H+2MM/T | Factory Acceptance Test for Fans – Measurement of Aerodynamic Performance, Measurement of Acoustic Performance- Differential (flow) pressure/Static pressures/ Barometric pressure/Temperature/ Humidity/Volts/Amps/Input power/ Speed verified. |
ADNOC/ROBSTONE UAE | Rumaitha NorthCO2 Project Expansion (WAG-CO2) | PE Type 5 CL1500 Mechanical Visual Bi-directional Pig Signaller, c/w Manual reset flag, 2" CS Flange RF (A350 LF2) mounted, Inconel 625 internals & Signaller Removal Tool | Fabrication, Coating, FAT, Hydro testing, Operational Test, Document Review, Final Inspection and Dispatch |
ALLIANCE ENERGY GENERAL CONTRACTOR LLC ABU DHABI | Dabb'iya Thamama Zone B Transition Zone Developments - Phase 1 | 33KV OHL SWITCHES | Electrical Testing /Functional Test |
ROBTSTONE ABU DHABI | TIE-INS OF BATCH-11 WELLS | Solar System | FAT/Instrument functional test |
ARCHIRODON UAE | Dabb'iya PROJECT | PAGA System Cabinets | Factory Acceptance Testing, Functional Test, Visual Checks, Document review, Final Inspection & Release |
Abu Dhabi | Dabb'iya Thamama Zone B Transition Zone Developments - Phase 1 | Axial Fans & Powder Coated Air Handling Units (AHU) Heating | Electrical Testing /functions of circulating, cleaning, heating, cooling, humidifying, dehumidifying and mixing of air: up to 11.7m³/s. Cooling: up to 12.4m³/s. Range from 400 to 3,000 cfm |
ROBTSTONE ABU DHABI | TIE-INS OF BATCH-11 WELLS | High Security Extreme weather CCTV System. | FAT/Instrument functional test |