Client | Project | Equipment | Activity |
---|---|---|---|
QATAR ENERGY/ VOLT AUTOMATION | EPIC for Telemetry System Replacement / Upgrade for MM & BH fields Wellhead Jackets and Real Time Data Transmission to Onshore Project | Flowmeter | 5 Point Production Calibration & Functional Test |
QATAR GAS | Topsides and Pipelines :Engineering, Procurement, construction, Installation and Commissioning (EPCI) | PIG LAUNCHER DRAIN PUMP | PMI, Hydrostatic Test, API 685 Running Clearance Check, Performance Test (with Job Motor), Mechanical Run Test (4 Hour with Job Motor), NPSH Test (with Job Motor), Noise Test (with Job Motor), Vibration Test (including FFT with Job Motor) |
BLACK CAT ENGINEERING | Arab D3 Gas Recycling Plant | Exchangers, Surfer Converter reactors, Burners, Muffle Furnace, Incinerators, Vessels, Heaters, Boiler, Piping and Structures | Carry out Expediting/Inspection of various equipment during shut down phase |
SAIPEM/QATARGAS | EPCOL for North Field Production Sustainability (NFPS) Offshore & Pipelines Project | MR TUBE AND TUBE FITTINGS | Visual, Dimensional, Marking, Quantity checks, Material certificates review |
SAIPEM | Engineering, procurement, Construction, and Installation of NFPS Project | MR TUBE AND TUBE FITTINGS | Visual Inspection, Marking Inspection, Quantity Check, Material Certificate Review, Final Inspection, Export Packing and Release Note |
BP AZERBAIJAN | CHIRAG PH2 | HYD Hunting Coupling | FAT Male ROV with Tube Tail |
MCDERMOTT / QATARGAS | NORTH FIELD PRODUCTION SUSTAINABILITY | Inconel 625, CD PIPE SMLS B36.10/B36.19 BE B444 UNS N06625 | SAMPLE SELECT, FINAL HEAT TREATMENT, HARDNESS TEST SAMPLE, CORROSION TEST SAMPLE, TENSILE TEST SAMPLES, GRAIN SIZE, HYDROSTATIC PRESSURE TESTING, VISUAL INSPECTION, DIMENSION INSPECTION, ULTRASONIC TESTING, DYE PENETRANT TESTING OF END BEVEL, PMI, PART MARKING &COLOUR CODING, CERTIFICATION, PACKING & IRN |
MCDERMOTT/QATARGAS | NORTH FIELD EXPANSION (NFXP) PROJECT – OFFSHORE - Topsides and Pipelines : Engineering, Procurement, Construction, Installation and Commissioning (EPCI) | PIG LAUNCHER SEAMLESS DRAIN PUMP | Dye Pen, PMI, Rotor balance, Hydrostatic Test, API 685 Running Clearance Check, Performance Test (with Job Motor), Mechanical Run Test (4 Hour), NPSH Test, Noise Test, Vibration Test (including FFT with Job Motor), Document Review and release |
MCDERMOTT/ QATARGAS, | NORTH FIELD PRODUCTION SUSTAINABILITY | Valve Casting Materials | Sample selection & Loading, Witness of Mechanicals & Chemical Analysis, Corrosion Testing |
QATARGAS / ADANAC | Qatar Liquefied Gas Co. Ltd (LQ Expansion Project) | Valves | Inspection of Assembled Valve, marking, Performing visual and final dimensional Inspection as per approved ITP, Witness Hydro testing, Seat Leakage Test, Cryogenic test, Witness Functional test, Review of MRB, Material Test Certificates and Testing Records, Issuing Inspection Release Note |
GENERAL ELECTRICS (GE) / TECHNIP) KUWAIT | Lower Fars Heavy Oil Development Program Phase 1 | FAT and Performance Tests & Review of Complete MDR/Release of SUPER-H PLUG VALVES | |
CARPENTER & PATERSONS LTD | Epic for New Gasoline and Jet Storage Facilities In MIC Project | Variable spring supports | Review of manufacturing Documents as per ITP activities |
PUBLIC WORKS AUTHORITY ASHGHAL/ DUTCO TENNANT QATAR WLL /LARSEN AND TOUBRO LTD DOHA QATAR | DBOM FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I PROJECT | Helden Flange Adaptors & Flanged Spigot Sets | Quantity Check, Dimensional Check, Visual Check, Coating Check, Packing, Documents Review |
FGP/WPMP KAZAKHSTAN DOHA QATAR | CHEVRON Corporation | Pressure Vessels | Expediting, Material checks, dimension checks, mark-out and cutup preparation, weld & fabrication, pressure & leak tests |
QATARGAS/SAIPEM | EPCOL for North Field Production Sustainability (NFPS) OFFshore & Pipelines Project | Motorized Damper (EID), Fire Damper (MFD), Volume Control Damper (VCD), Blast Proof Damper (BRD), Weather Louvers | Dimensional check, Overall build quality check, Inspection tagging, fire trigger check, Damper opening and closing operation, Operation of switches, Electric continuity 5 open/closed cycle tests |
MCDERMOTT/ QATARGAS, | NORTH FIELD PRODUCTION SUSTAINABILITY | Fire Valve Bodies | Furnace Loading & Unloading, Witness of Heat Treatment (HT) |
PETROCON ECC WLL | EPIC For Various Pipeline MOCS In Dukhan Project | 28” Bandlock 2 (Pig Launcher QOC) | PMI, FINISH ASSEMBLY / FUNCTIONAL, FINAL INSPECTION, Nameplate Stamping, Document Review |
MCDERMOTT/ QATARGAS, | NORTH FIELD PRODUCTION SUSTAINABILITY | Valves and Hubs | UT, MPI, PMI, Radiography, Coating, Witness Functional/Performance, Gas, HP & Hydro tests, Final and Release |
NORTH OIL COMPANY (NOC)/PONTICELLI UPSTREAM LLC | Block 5 - AL SHAHEEN FIELD (DBN PWM & AB OBS EPCIC) Project | 150LB Y Type Strainer | Fabrication & Hydrostatic Testing for castings, forgings and fabricated strainers, Final Inspection & Packing Inspection |
NORTH OIL COMPANY (NOC) | PTSC MECHANICAL AND CONSTRUCTION Block 5 Al Shaheen Field Development GALLAF 3 | Maintenance Davit Arm / 2 x 30MT Pedestal Crane (API 2C) | Pre-Inspection Meeting, Material Inspection, All Fabrication including kingpost, NDT, Coating, Welding, Fitting, Assembly, Electrical Testing, Load Test, FAT/Performance Test, Function Testing, Endurance Test, Creep Test, Noise Test, Safe Load Indicator Calibration, Hoisting & Slewing Speed Checks, Personnel Lifting Mode Test, Dynamic Overload Test, Gross Overload Release Test with SWL, Emergency Load Lowering & Slewing Test, Endurance Test, Final Inspection and Document Review. |